Chief project specialist job description. GIP is the chief engineer of the project

I CONFIRM:

________________________

[Job Title]

________________________

________________________

[Name of organization]

________________/[F.I.O.]/

"____" ____________ 20__

JOB DESCRIPTION

Chief Project Engineer

  1. General provisions

1.1. This job description defines and regulates the powers, functional and job responsibilities, rights and responsibilities of the chief engineer of the project [Name of the organization in genitive case] (hereinafter referred to as the Company).

1.2. The chief engineer of the project belongs to the category of managers, is appointed to the position and dismissed from the position in the manner established by the current labor legislation by order of the head of the Company.

1.3. The chief project engineer reports directly to the head of the Company.

1.4. A person with a higher education degree is appointed to the position of chief engineer of the project vocational education and work experience in design or scientific and pedagogical work in the relevant field of knowledge of at least 8 years, and in the design of particularly large and complex objects - at least 10 years.

1.5. The chief project engineer must know:

  • prospects for the development of the relevant sector of the economy, science and technology;
  • design methods;
  • organization, planning and economics of design and engineering surveys;
  • advanced domestic and foreign experience design and construction;
  • basics of standardization, certification and patent science;
  • resolutions, instructions, orders of higher authorities, guidance, methodological and regulatory materials on the design, construction and operation of facilities;
  • technical, economic, environmental and social requirements for the facilities being designed;
  • labor organization requirements when designing objects for various purposes;
  • building codes and regulations;
  • modern technical means for designing and performing computational work;
  • standards, technical specifications and other guidance materials on the development and execution of design estimates and other technical documentation;
  • the procedure for concluding and executing contracts for the creation (transfer) of scientific and technical products; economics and organization of construction;
  • copyright;
  • means of automation of design work;
  • rules and regulations of labor protection.

1.6. The chief engineer of the project is guided in his activities by:

  • company charter;
  • this job description;
  • regulatory materials for the design, construction and operation of facilities.

1.7. During the period of temporary absence of the chief engineer of the project, his duties are assigned to [name of the deputy position], who is appointed in the prescribed manner, acquires the appropriate rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement.

2. Job responsibilities

The chief project engineer is required to perform the following job functions:

2.1. Provides technical management of design and survey work during the design of the facility and supervision of its construction, commissioning and development of design capacities.

2.2. Based on the use of the latest achievements of science and technology, the most appropriate and economical design solutions ensure a high technical and economic level of the designed objects.

2.3. Takes measures aimed at improving the quality of design estimates and reducing the consumption of material resources during the construction of facilities, reducing the cost of their operation based on improving the quality of design, urban planning and architectural planning solutions.

2.4. Prepares data for concluding contracts with customers for the development (transfer) of scientific and technical products, including justification of contract prices.

2.5. Participates in the work of commissions for the selection of sites (routes) for construction, in the preparation of design assignments and in the organization of engineering surveys for the development of design estimates and other technical documentation.

2.6. Organizes its development for the facilities assigned to him, participates in the preparation of comprehensive plans and schedules for the implementation of research, design, engineering and technological work for facilities where new technological processes and equipment with a long development, design and manufacturing cycle will be used.

2.7. Draws up calendar plans for the release of scientific and technical products.

2.8. Develops proposals on the composition of project developers, distributes tasks between them according to sections and parts of the project, volumes and costs of work.

2.9. Forms assignments for subcontractors to perform the work entrusted to them and provides these organizations with the necessary initial data.

2.10. Resolves issues that arise during the development of documentation.

2.11. Monitors the technical level of design, urban planning and architectural planning decisions taken, the economical expenditure of funds for design and survey work, and the timing of development of design and estimate documentation.

2.12. Guarantees compliance of the developed design and estimate documentation with state standards, norms, rules and instructions.

2.13. Provides verification of patent purity and patentability of technological processes, equipment, devices, structures, materials and products first used in the project or developed for it.

2.14. Protects the project in higher organizations and examination bodies.

2.15. Participates in the review and approval of design and estimate documentation by the general contracting construction organization.

2.16. Resolves issues that arise in the process of construction design, commissioning of a facility, and development of design capacities.

2.17. Organizes work to eliminate detected defects in design estimates and other technical documentation, as well as to record the expenditure of approved estimates.

2.18. Prepares proposals to the management of the design organization and the customer to make changes to the working documentation related to the introduction of new regulatory documents, taking into account the actual state of construction.

2.19. Coordinates justified deviations from current norms, rules, instructions with state supervisory authorities and other organizations that have approved them.

2.20. Provides analysis and generalization of experience in the design, construction and operation of constructed facilities and preparation on this basis of proposals to improve the technical and economic level of design solutions.

2.21. Prepares reviews and conclusions on rationalization proposals and inventions, draft standards, technical specifications and other regulatory documents related to design and construction.

2.22. Takes part in the examination of projects, preparation of publications and drawing up applications for inventions, in seminars and conferences in his specialty.

In case of official need, the chief engineer of the project may be involved in the implementation of his duties. job responsibilities overtime, in the manner prescribed by law.

3. Rights

The chief engineer of the project has the right:

3.1. Participate in the discussion of draft decisions of the head of the company.

3.2. Manage the financial resources and property entrusted to him in compliance with the requirements determined by legislative and regulatory legal acts and the organization’s charter.

3.3. Sign and endorse documents within your competence.

3.4. Initiate and conduct meetings on organizational, financial and economic issues.

3.6. Conduct quality checks and timely execution of orders.

3.7. Demand cessation (suspension) of work (in case of violations, non-compliance with established requirements), compliance with established norms, rules, instructions, give instructions for correcting deficiencies and eliminating violations.

3.8. Submit for consideration by the head of the company proposals on the hiring, transfer and dismissal of employees, on the encouragement of distinguished employees and on the application of disciplinary sanctions to employees who violate labor discipline.

3.9. Participate in discussions of issues related to the duties performed by him.

3.10. Require the head of the company to provide assistance in the performance of his official duties and rights.

4. Responsibility and performance evaluation

4.1. The chief engineer of the project bears administrative, disciplinary and material (and in some cases provided for by the legislation of the Russian Federation, criminal) responsibility for:

4.1.1. Failure to carry out or improperly carry out official instructions from the immediate supervisor.

4.1.2. Failure to perform or improper performance of one's job functions and assigned tasks.

4.1.3. Illegal use of granted official powers, as well as their use for personal purposes.

4.1.4. Inaccurate information about the status of the work assigned to him.

4.1.5. Failure to take measures to suppress identified violations of safety regulations, fire safety and other rules that pose a threat to the activities of the enterprise and its employees.

4.1.6. Failure to ensure compliance with labor discipline.

4.2. The assessment of the work of the chief engineer of the project is carried out:

4.2.1. By the immediate supervisor - regularly, in the course of the employee’s daily performance of his labor functions.

4.2.2. The certification commission of the enterprise - periodically, but at least once every two years, based on documented results of work for the evaluation period.

4.3. The main criterion for assessing the work of the chief project engineer is the quality, completeness and timeliness of his performance of the tasks provided for in this job description.

5. Working conditions

5.1. The work schedule of the chief project engineer is determined in accordance with the internal labor regulations established by the Company.

5.2. Due to production needs, the chief engineer of the project is required to go on business trips (including local ones).

5.3. To resolve operational issues related to ensuring production activities, the chief engineer of the project may be allocated company vehicles.

6. Signature right

6.1. To ensure his activities, the chief engineer of the project is given the right to sign organizational and administrative documents on issues within his competence by this job description.

I have read the instructions ____/____________/ “__” _______ 20__

I CONFIRM:
General manager
________________________
/_______________/
"____" ____________ 201_

1. General provisions
1.1. The chief engineer of the project belongs to the category of managers.
1.2. The chief engineer of the project is appointed to the position on a competitive basis in order to organize the development of design estimates, tender and other documentation necessary for construction and management of design and survey work, throughout the entire period of preliminary feasibility assessments and investment calculations, bidding, conclusion of an agreement with the customer, design, construction, commissioning of the facility and development of design capacities. The decision on appointment to the position of chief engineer of the project and on dismissal from the position is made by the General Director of the Company.
1.3. The chief engineer of the project reports directly to the General Director of the Company.
1.4. During the absence of the chief engineer of the project (vacation, illness, etc.), his duties are performed by a person appointed by order of the general director, who acquires the corresponding rights and is responsible for the improper performance of the duties assigned to him.
1.5. The chief engineer of the project is guided in his activities by: current legislation, regulatory materials for the design, construction and operation of facilities; The charter of the enterprise, local regulatory legal acts, regulatory and administrative documents issued by the head of the organization; this job description, as well as other local regulations.
1.6. A person with a higher professional education, five years of project management experience, and at least eight years of design experience is appointed to the position of chief project engineer.
1.7. The chief project engineer must know:
- legislative acts, regulatory legal and administrative documents, international and state standards, technical specifications and other materials on the development and execution of design estimates and other technical documentation, catalogs of design documentation for mass use, technical regulations, building codes and regulations, regulatory documents of government bodies supervision, other regulatory materials in relation to the specialization of the position;
- prospects for technical, economic and social development industries;
- economics and organization of construction, labor and management;
- basics of copyright and patent law;
- protection requirements environment and environmental safety;
- basics of labor legislation, rules and regulations of labor protection, safety precautions, industrial sanitation and fire protection;
- advanced design and construction experience;
- organization, planning, economics of design and engineering surveys;
- design methods;
- modern technical means for designing and performing computational work;
- means of automation of design work;
- certification procedure;
- profile, specialization and features of the enterprise structure;
- market methods of managing and managing an enterprise, its business plan;
- technical, economic, environmental and social requirements for the facilities being designed;
- the procedure for concluding and executing economic and financial contracts, contracts for the creation (transfer) of scientific and technical products;
- local regulations related to project activities.
1.8. To perform the functions and exercise the rights provided for in this job description, the chief project engineer interacts with:
- with the General Director of the Company or his replacement official on issues of receiving instructions, instructions, orders related directly to his activities; as well as providing all necessary information on cash flow at the Company's cash desk;
- with the chief accountant and his deputy(s) on the following issues: obtaining the necessary accounting and tax reporting;
- with the head of the HR department on issues of obtaining personnel documentation;
- with employees included in the project team on issues of managing a specific project and monitoring its implementation;
- with other employees on the issues of obtaining all the necessary, properly executed documents for carrying out operations to conduct their project.

2. Job responsibilities
2.1. Chief Project Engineer:
- Prepares and approves the task for performing engineering survey work, the task for preparing design documentation for a capital construction project;
- Determines the criteria for selecting participants in the work of performing engineering surveys, preparing design documentation and selecting performers of such work, as well as coordinating the activities of performers of such work;
- Approves the results of engineering surveys and design documentation;
- Presents, coordinates and accepts the results of engineering surveys and preparation of design documentation;
- ensures planning of the enterprise’s activities on issues within its competence;
- organizes the preparation of a calendar plan for the development of design and other documentation for construction, calendar plans for the production of scientific and technical products;
- participates in the development and preparation of schedules for the implementation of research, design, engineering and technological work for facilities where new technological processes and equipment with a long development, design and manufacturing cycle will be used;
- monitors the timing of development of design and estimate documentation, timing of design and survey work;
- monitors the compliance of the technical and economic levels of the adopted design decisions with the established requirements, the economical expenditure of funds for design and survey work, the timeliness of the development of design and estimate documentation;
- coordinates design and survey work throughout the entire project complex;
- controls the timeliness of placing orders for the supply of equipment and materials, organizing their acceptance, and filing, if necessary, claims against manufacturers and suppliers;
- organizes monitoring of the progress of work on the implementation of the project;
- organizes work to check for patent purity of technological processes, equipment, structures, materials and products first used or developed on the project;
- analyzes and systematizes the experience of design, construction and operation of constructed facilities, prepares, on this basis, proposals to improve the technical level and economic efficiency of design solutions;
- takes the necessary measures to ensure the required dynamics of investments and the receipt of income from the implementation of the project, sufficient to compensate investors for the resources they have invested and the risk they have taken;
- ensures compliance with norms and standards for the design, construction and operation of facilities, other individual customer requirements for the technological level and quality, architectural expressiveness and social significance of facilities;
- ensures the practical application of advanced scientific and technical achievements and the introduction of progressive technologies to ensure the competitiveness of the enterprise in the domestic (world) market;
- exercises control over the activities of subcontractors insofar as they relate to the conduct of its project;
- participates in tenders (auctions) held by the customer when placing an order for the design of facilities.
2.2. Prepares data for concluding an agreement with the customer for the performance of design and survey work and the provision of engineering and consulting services, including the stages of development, the composition and volume of documentation for construction, the conditions for insuring risks associated with the development of the project and its implementation, justification negotiated prices, copyright and intellectual property protection, confidentiality conditions.
2.3. If necessary, participates in determining the composition of project participants, including subcontracting design and survey organizations, distributing tasks among them, concluding agreements on the scope of work, deadlines for their completion and payment terms.
2.4. Provides a high technical and economic level of designed objects based on the use of the latest achievements of science and technology, the most appropriate and economical design solutions.
2.5. Ensures compliance of the developed design and estimate documentation with urban planning and other norms, state standards, rules and instructions.
2.6. Ensures the development of the most appropriate and cost-effective design solutions.
2.7. Ensures that projects comply with technical specifications for design and working documentation.
2.8. Participates in the selection and approval of the location of the facility, in the preparation of design assignments and, if necessary, in the organization of engineering surveys.
2.9. Provides technical management of design and survey work during the design of the facility and supervision of its construction, commissioning and development of design capacities.
2.10. Takes measures aimed at improving the quality of design estimates and reducing the consumption of material resources during the construction of facilities, reducing the cost of their operation based on improving the quality of design, urban planning and architectural planning solutions.
2.11. Protects the project in the examination bodies, carries out the necessary approvals with state authorities and local governments.
2.12. Participates in the work of commissions for the selection of sites (routes) for construction, in the preparation of design assignments and in the organization of engineering research for the development of design estimates and other technical documentation, and organizes its development.
2.13. Forms assignments for subcontractors to perform the work entrusted to them and provides these organizations with the necessary initial data, resolves issues that arise during the development of documentation.
2.14. Taking into account the actual state of construction or in connection with the introduction of new regulatory documents, it prepares motivated proposals for the customer to make changes to the working documentation.
2.15. Provides timely resolution of issues related to design and arising during the construction process, commissioning of the facility and development of design capacities.
2.16. Organizes work to eliminate detected defects in design estimates and other technical documentation, as well as to record the expenditure of approved estimates.
2.17. Conducts the necessary approvals with state supervisory authorities and other organizations of justified deviations from current norms, rules, and instructions.
2.18. Prepares reviews and conclusions on rationalization proposals and inventions, draft standards, technical specifications and other regulatory documents related to design and construction.
2.19. Takes part in the examination of projects, preparation of publications and preparation of applications for inventions, attends seminars, practical conferences according to your specialty.

3. Rights
The chief engineer of the project has the right:
3.1. Receive assistance from the General Director of the Company and his immediate superiors in the performance of his official duties.
3.2. Represent the design organization in institutions, organizations and enterprises on the development, coordination and review of design and other documentation for construction, manufacture and supply of equipment and materials, construction and development of design capacities.
3.3. Make decisions and conduct correspondence over your signature on issues of technical and economic assessments and investment calculations, bidding, concluding an agreement with the customer, design, construction, commissioning of the facility and development of design capacities.
3.4. Conduct negotiations and enter into preliminary agreements with the customer upon receipt of an order for the design and construction of a facility, including the contract price and other conditions for the work.
3.5. Form the composition of participants in the development of the project, including specialists who are not part of the organization’s staff, determine their powers, forms of organization and remuneration, incentives and penalties.
3.6. Check the status of project development, including with the involvement of competent specialists and organizations as experts and consultants, compliance with established design deadlines and the quality of design solutions in the process of developing project documentation.
3.7. Make decisions about the formation of a reserve of funds and its use.
3.8. Conduct additional inspection or testing of structures, carry out quality checks on any part of the structure.
3.9. Suspend construction and installation works if they are carried out with deviations from the project, if technical conditions and rules for the production of these works are violated, as well as if their quality is unsatisfactory.
3.10. Prohibit the use of any materials and equipment that do not meet the established requirements.
3.11. Suspend the fulfillment of contractual obligations if there is a need for additional approval with the customer for the implementation or acceptance of construction and installation work with deviations from the technical specifications for the project.

4. Responsibility
The chief project engineer is responsible for:
4.1. For improper performance or failure to fulfill their official duties as provided for in this job description.
4.2. For causing material damage to the employer - within the limits established by labor legislation Russian Federation.
4.3. For offenses committed in the course of their activities, within the limits established by the administrative, civil, and criminal legislation of the Russian Federation.
4.4. For violation of information confidentiality regimes, failure to ensure systematization and safety of documents to which he receives access in the course of carrying out his job duties, in the manner and under the conditions established by the legislation of the Russian Federation.
4.5. For violation of the requirements of the Company's Internal Labor Regulations, fire and safety regulations, Rules for working with documents constituting a trade secret, in the manner and under the conditions established by the legislation of the Russian Federation.

I APPROVED

General manager

_____________ (____________)

"____"_____________ _____ G.

JOB DESCRIPTION

chief project engineer

1. GENERAL PROVISIONS

Labor protection rules and regulations.

1.6. During the period of temporary absence of the chief engineer of the project, his duties are assigned to ____________.

2. JOB RESPONSIBILITIES

2.1. The job responsibilities of the chief project engineer include:

organization of incoming control;

operational planning, coordination, organization and conduct of construction control during construction, reconstruction, capital construction projects;

acceptance of completed types and individual stages of construction, reconstruction work, major renovation capital construction objects, elements, structures and parts of capital construction objects, engineering and technical support networks, their sections with the right to sign the relevant documents;

signing the following documents:

a) act of acceptance of a capital construction project;

b) a document confirming the compliance of the constructed or reconstructed capital construction facility with the requirements of technical regulations;

c) a document confirming the compliance of the parameters of the constructed or reconstructed capital construction facility, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used;

d) a document confirming the compliance of the constructed or reconstructed capital construction facility with the technical conditions for connection (technological connection) to engineering support networks (if any).

Technical management of design and survey work during the design of the facility and its construction, commissioning and development of design capacities.

Ensuring, based on the use of the latest achievements of science and technology, the most appropriate and economical design solutions of a high technical and economic level of the designed objects.

Taking measures aimed at improving the quality of design estimates and reducing the consumption of material resources during the construction of facilities, reducing the cost of their operation based on improving the quality of design, urban planning and architectural planning solutions.

Preparation of data for concluding contracts with customers for the development (transfer) of scientific and technical products, including justification.


Participation in the work of commissions for the selection of sites (routes) for construction, in the preparation and organization of engineering surveys for the development of design estimates and other technical documentation.

Organization of its development for the facilities assigned to him, participation in the preparation of comprehensive plans and schedules for the implementation of research, design, engineering and technological work for facilities where processes and equipment with a long development, design and manufacturing cycle will be used.

4.3. Failure to comply with orders, instructions and instructions of the Head of the Organization.

4.4. Failure to take measures to suppress identified violations of fire safety and other rules that pose a threat to the activities of the Organization and its employees.

4.5. Failure to ensure compliance with labor discipline.

5. WORKING CONDITIONS

5.1. The work schedule of the chief project engineer is determined in accordance with the Internal Labor Regulations established in the Organization.

5.2. Due to production needs, the chief engineer of the project is required to go on business trips (including local ones).


I approve

[position, signature, full name.

Manager or other

Official authorized

Approve

[organizational and legal form, job description]

name of organization, [day, month, year]

enterprises] M.P.

Job description

chief specialist of the architectural and design department [company name]

This job description has been developed and approved in accordance with the provisions Labor Code Russian Federation and other legal acts regulating labor relations in the Russian Federation.

1. General provisions

1.1. The chief specialist of the architectural and design department (hereinafter referred to as the Chief Specialist) belongs to the category of specialists, is hired and dismissed by order of [name of the manager's position].

1.2. The chief specialist reports directly to [name of the immediate supervisor].

1.3. A person with a higher professional education in the specialty “Building Design” or higher professional education and professional retraining in the direction of “Design of Buildings and Structures”, work experience in the specialty of at least 3 years, is accepted for the position of chief specialist; advanced training at least once every 5 years and the availability of a qualification certificate for compliance with the position held.

1.4. The chief specialist must know:

Laws and other regulatory legal acts of the Russian Federation in the field of architecture and urban planning;

Regulatory methodological and regulatory documents on the design, construction and operation of facilities;

Prospects for the development of architectural and construction design;

Design methods;

Organization, planning and economics of design and engineering surveys;

Advanced domestic and foreign experience in design and construction;

Technical, economic, environmental and social requirements for the facilities being designed;

Fundamentals of labor organization in design;

Building codes and regulations;

Standards, technical conditions and other regulatory documents for the development and execution of design estimates and other technical documentation;

Basics of standardization and patent science;

Economics and organization of construction;

Software systems and types of automation tools for design and computational work;

Fundamentals of labor legislation;

Labor safety rules.

2. Job responsibilities

The chief specialist of the architectural and design department is assigned the following job responsibilities:

2.1. Develops the most important design decisions for a separate section (part) of the project.

2.2. Organizes patent research to ensure the patent purity of new design solutions and their patentability.

2.3. Prepares proposals for the use of the most progressive and cost-effective competitive design solutions in the project.

2.4. Generates tasks for the development of sections (parts) of the project and issues them to the performers.

2.5. Checks the compliance of the developed design solutions with the given assignment.

2.6. Provides technical guidance for the development of sections (parts) of the project using design automation tools and participates in resolving issues related to these sections (parts) at all stages and phases of design, construction, commissioning of facilities and development of design capacities.

2.7. Participates in the coordination of design decisions and in discussion of the project in higher organizations and examination bodies.

2.9. Taking into account the actual state of construction, prepares proposals for making changes to the working documentation when new regulatory documents are put into effect.

2.10. Analyzes and summarizes experience in the design, construction and operation of constructed facilities, and on this basis prepares proposals for improving the design and implementation of measures to improve the technical and economic level of design solutions.

2.11. Prepares reviews and conclusions on rationalization proposals and inventions, draft standards, technical specifications and other regulatory documents related to design and construction.

2.12. Takes part in the examination of projects, the preparation of publications and the preparation of applications for inventions, the work of seminars and conferences in his specialty.

2.13. Manages employees subordinate to him.

2.14. [Other responsibilities].

3. Rights

The chief specialist has the right:

3.1. For all social guarantees provided for by law.

3.2. Within your competence, analyze the activities of the department and make proposals for its improvement.

3.3. Require the management of the enterprise to provide assistance in the performance of their official duties.

3.4. Receive materials and information on your activities.

3.5. Get acquainted with the draft decisions of the head of the enterprise relating to his activities.

3.6. Sign and endorse documents within your competence.

3.7. Improve your professional qualifications.

I approve

Director

OOO "………….."

Ivanov I.I.

"____" "______" 201... g.

Job description

Chief Project Engineer

1. General provisions


  1. This job description defines the functional responsibilities of the rights and responsibilities of the chief engineer of the project of LLC “……..”

  2. The chief engineer of the project belongs to the category of managers, is appointed to the position and dismissed from the position in the manner established by the current labor legislation by order of the head of the Company.

  3. The chief project engineer reports directly to the head of the Company.
1.4. A person with a higher professional education and work experience in the design and construction of residential and industrial facilities of at least 3 years, and in the design of particularly large and complex facilities - at least 10 years, is appointed to the position of chief engineer of the project.

1.5. The chief project engineer must know:


  • legislative and regulatory legal acts, administrative and regulatory materials on the design, construction and operation of facilities;

  • profile, specialization and features of the organization’s structure;

  • technical prospects, economic development organizations;

  • design methods;

  • organization, planning and economics of design and engineering surveys;

  • best practices in design and construction;

  • modern technical means for designing and performing computational work;

  • means of automation of design work;

  • technical, economic, environmental and social requirements for the facilities being designed;

  • technical regulations, construction standards and rules;

  • the procedure for concluding and executing contracts for the creation (transfer) of scientific and technical products;

  • standards, technical specifications and other guidance materials for the development and execution of design estimates and other technical documentation;

  • economics and organization of construction;

  • copyright;

  • basics of standardization, certification and patent science;

  • environmental protection requirements;

  • office work standards (classification of documents, procedures for execution, registration, passage, storage, etc.);

  • basics of labor legislation;

  • rules and regulations of labor protection, safety, industrial sanitation and fire protection;

  • environmental protection requirements.
1.6. The chief engineer of the project is guided in his activities by:

  • company charter;

  • this job description;

  • regulatory materials for the design, construction and operation of facilities.

2. Functional responsibilities


    1. The chief engineer of the project is required to perform the following labor functions and his job responsibilities for organizing engineering surveys and organizing architectural and construction design include, respectively:

  • preparation and approval of assignments for the performance of engineering survey work, assignments for the preparation of design documentation for a capital construction project;

  • determining criteria for selecting participants in the work of performing engineering surveys, preparing design documentation and selecting performers of such work, as well as coordinating the activities of performers of such work;

  • presentation, approval and acceptance of the results of engineering surveys and preparation of design documentation;

  • approval of the results of engineering surveys and design documentation;

  1. Provides technical management of the design process, organizational
management of all design participants, strives to improve the quality of engineering and design solutions, high technical and economic level of designed objects.

  1. Organizes the development of high-quality and complete design documentation and the delivery of finished design products within the time frame established by the schedule.

  2. Participates in the work of the commission for selecting a site (route) for construction, in preparing design assignments and in organizing inspections of objects subject to reconstruction.

  3. Draws up a comprehensive schedule for the implementation of design and survey work, and, if necessary, scientific research work for objects.

  4. Forms a composition of project developers with the involvement of representatives of subcontractor organizations, distributes tasks between them according to sections and parts of the project and the scope of work.

  5. Organizes timely and high-quality preparation of assignments for subcontracting design and survey organizations to carry out work and provides these organizations with the necessary initial data for design.

  6. Manages the preparation of information and data necessary for the preparation and conclusion of contracts for design and survey work, including estimates and special conditions to the contract, checks and endorses all materials under the contracts.

  7. Organizes the development of the necessary options to identify the most appropriate and economical design solutions, unified space-planning, design and technological solutions, components, structures and products.

  8. Develops the most complex sections dictated by the purpose or specific conditions of the designed object explanatory note and others technical documents, or participates in their development.

  9. With the methodological assistance of the patent service, organizes work to check the patent purity and patentability of equipment, structures, materials and products first used or developed in the project.

  10. Timely resolves all design-related issues that arose during the construction and commissioning of facilities, resolves conflict situations that arise between design participants, and ensures the interconnection of all sections and parts of the project.

  11. Carries out control and coordination of design and survey work for the entire project complex, ensures the issuance of complete design documentation to the customer within the time limits specified in the schedule for the contract for the performance of these works.

  12. Monitors the compliance of projects with the design assignment and working documentation, the approved project, the correct application of norms, rules, instructions and state standards, signs the design documentation drawings in the prescribed manner.

  13. Checks the status of the development of design documentation, compliance with design deadlines and the quality of design solutions in the process of developing design documentation by all design participants, the correctness of spending funds on design and survey work.

  14. Carries out systematic step-by-step accounting of work performed, manages the preparation of acceptance certificates for design products, and organizes their signing by customers.

  15. Organizes the protection of projects in coordinating organizations, participates in the review and approval of project documentation by the general contracting construction organization in accordance with the procedure established by the Ministry of Construction of the Russian Federation.

  16. Coordinates project documentation, carried out with justified deviations from current norms, rules and instructions, with state supervisory authorities.

  17. Organizes and controls designer's supervision of construction, personally carries out designer's supervision of objects.

  18. Immediately notifies the organization's management of all serious violations in the design process and designer's supervision of construction, and takes measures to eliminate them.

  19. Monitors the processes for which he is responsible, records on monitoring and evaluation of the progress of processes quarterly transfers to the Quality Service.

  20. Convenes a meeting or participates in the work of working groups of the architectural and technical council of the organization, in meetings and conferences with the management of the organization and in other organizations on issues of reviewing the progress of design work, designer's supervision of the construction and commissioning of designed facilities.

  21. Conducts an analysis of the workload of design participants and, if necessary, attracts additional design participants.

  22. Requires brigade and group leaders to draw up operational schedules for the development of design and estimate documentation, according to the sheet-by-sheet composition of the project, indicating the executors of each drawing.

  23. Resolves conflict situations on design issues between design participants.
In case of official necessity, the chief engineer of the project may be involved in performing his duties overtime, in the manner prescribed by law.

3. Rights
The chief engineer of the project has the right:


  1. Participate in the discussion of draft decisions of the head of the company.

  2. Manage the financial resources and property entrusted to him in compliance with the requirements determined by legislative and regulatory legal acts and the organization’s charter.

  3. Sign and endorse documents within your competence.

  4. Initiate and conduct meetings on organizational, financial and economic issues.

  5. Request and receive necessary information and documents from structural divisions.
3.6. Conduct quality checks and timely execution of orders.

  1. Demand cessation (suspension) of work (in case of violations, non-compliance with established requirements), compliance with established norms, rules, instructions, give instructions for correcting deficiencies and eliminating violations.

  2. Submit for consideration by the head of the company proposals on the hiring, transfer and dismissal of employees, on the encouragement of distinguished employees and on the application of disciplinary sanctions to employees who violate labor discipline.

  3. Participate in discussions of issues related to the duties performed by him.

  4. Require the head of the company to provide assistance in the performance of his official duties and rights.

4. Responsibility and performance evaluation


  1. The chief engineer of the project bears administrative, disciplinary and material (and in some cases provided for by the legislation of the Russian Federation, criminal) responsibility for:

  1. Failure to carry out or improperly carry out official instructions from the immediate supervisor.

  2. Failure to perform or improper performance of one's job functions and assigned tasks.

  3. Illegal use of granted official powers, as well as their use for personal purposes.

  4. Inaccurate information about the status of the work assigned to him.

  5. Failure to take measures to suppress identified violations of safety regulations, fire safety and other rules that pose a threat to the activities of the enterprise and its employees.

  6. Failure to ensure compliance with labor discipline.

  1. The assessment of the work of the chief engineer of the project is carried out:

  1. By the immediate supervisor - regularly, in the course of the employee’s daily performance of his labor functions.

  1. The main criterion for assessing the work of the chief project engineer is the quality, completeness and timeliness of his performance of the tasks provided for in this job description.

5. Working conditions


  1. The work schedule of the chief project engineer is determined in accordance with the internal labor regulations established by the Company.

  2. Due to production needs, the chief engineer of the project is required to go on business trips (including local ones).

  3. To resolve operational issues related to ensuring production activities, the chief engineer of the project may be allocated company vehicles.

6. Signature right
6.1. To ensure its activities, the chief engineer of the project is given the right to sign organizational and administrative documents on issues within his competence

I have read the instructions _______________ “____” _____________ 201...